Request Quote

What Is Your MOQ and Production Lead Time?

Standard MOQ 50 pieces per size for flanges and fittings, 5 tons for steel pipes. Production lead time 15-25 days. Trial orders and urgent expedited production available. Weekly sailings from Tianjin Port.

Standard Minimum Order Quantities

Our MOQ policy balances production efficiency with buyer flexibility:

  • Pipe Flanges: 50 pieces per size/type for all flange types including weld neck, slip-on, blind, socket weld, threaded, and lap joint.
  • Butt-Weld Fittings: 50 pieces per size/type for elbows, tees, reducers, and caps.
  • Steel Pipes: 5 metric tons minimum for seamless, spiral welded, 3PE, and PU insulated pipes combined.
  • Expansion Joints and Hoses: 10 pieces per type/size.

Trial Orders and Small Quantities

  • Sample orders: 5-10 pieces of standard sizes at a small premium for quality verification.
  • Mixed container shipments: Combine multiple product types to reach FCL volume.
  • LCL shipping: Less-than-container-load available for trial orders via our freight forwarders.

Production Lead Time Breakdown

StageDurationDetails
Order Confirmation1-2 daysTechnical review, drawing approval, proforma invoice
Raw Material Procurement3-5 daysSteel billet/plate from approved mills with material certificates
Forging/Forming5-7 daysCNC forging, heat treatment, normalization
Machining5-7 daysCNC turning, drilling, facing, grooving
QC and Inspection2-3 daysNDT, dimensional check, hydro test, MTC preparation
Packaging and Loading1-2 daysWooden case packing, container stuffing

Total standard lead time: 15-25 days from order confirmation to ex-factory readiness. For urgent projects, we can compress to 7-12 days with a 10-15% surcharge.

Ready to Place an Order?

Send us your specifications and receive a quotation within 24 hours.

Request Quote